During the start-up operation (phase) of a cryogenic unit, a separator exploded, releasing ethane, ethylene, methane and hydrogen. The bursting of a tank was caused by a 1600 mm long incipient crack which had been formed at the inside of the tank along a weld line (a ferritic basis metal had been welded with an austenitic weld metal).
The hydrogen induced incipient crack (cracking) was caused by the alternating load during start-up and shut-down phases in the course of the operating time.- Event Initiating system
- Classification of the physical effects
- Hydrogen Release and Ignition
- Nature of the consequences
- fire
- Macro-region
- Europe
- Country
- Germany
- Date
- Component involved
- heat exchanger (cold box)
- Failure mode
- rupture & ignition
- Initiating cause
- H2-driven material degradation
- Root CAUSE analysis
The INITIATING CAUSE was hydrogen induced cracking originated by the geometric form variation and the resulting plastic deformation in the area of a longitudinal seam weld. This incipient cracking was favoured by the high tensile (strength) austenitic CrNiMnW weld metal with its particularly accentuated martensitic composite (mixed) zone (area) along the transition between weld metal and basis metal and was also favoured by its physical characteristics which differ strongly from the basis metal.
Possible ROOT CAUSES could two contributions: (i) a wrong execution of the welding (wrong choice of materials, inadequate thermal management), and a lack of inspection / maintenance.
- Root causes
- Date entry in HIAD
- 28/02/2009
Facility
- Application
- Petrochemical industry
- Sub-application
- distillation / gas separation
- Hydrogen supply chain stage
- All components affected
cryogenic unit, separator, weld
- Location type
- Open
- Location
- industrial area
- Operational condition
- Pre-event occurrences
At the moment of the release, the plant was in in the start-up phase of a cryogenic unit.
- Description of the facility/unit/process/substances
DESCRIPTION OF THE PROCESS
A cryogenic separator in a refinery has the role to separeate heavier components (like propane, butane, and natural gas liquids - NGLs) to liquefy while lighter ones (like methane or hydrogen) remain gaseous,based on the difference between their boiling points. The process involves compressing, and cooling the gas, then flashing (a sudden pressure drop) to create liquid/vapor phases, followed by fractionation in columns where each component is boiled off sequentially.
Emergency & Consequences
- Number of fatalities
- 0
- Number of injured persons
- 0
- Currency
- Euros
- Property loss (onsite)
- 1.500.000
- Post-event summary
Large material damages (losses) due to the destruction of plant parts, estimated as approx. 1.5 million ECU. No persons were injured.
The neighbourhood was strongly disturbed by the noise caused by the bursting of the tank and the consequent flaring activities.- Emergency action
The emergency shut-down switch (automatic safety device) was activated and the on-site fire-brigade was informed.
Further the air-conditioning system of the measuring control centre were shut-down as precautionary measure. The control centre and the plant were evacuated, the plant equipment was emptied and stress released.
In-depth data
- Release type
- gas mixture
- Involved substances (% vol)
- C2H6
C2H4
CH4
H2 - Probable IGNITION SOURCE
References
- Sources categories
- eMARS
- Reference & weblink
Event description in the European database eMARS
https://emars.jrc.ec.europa.eu/en/eMARS/accident/view/2f7bf3bd-14f6-f0e…
(accessed October 2020)Event description in the French database ARIA
https://www.aria.developpement-durable.gouv.fr/accident/14666/
(accessed October 2020)