Skip to main content
Clean Hydrogen Partnership

LH2 valve leaking at a research centre

Event

Event ID
1234
Quality
Description

This near miss affected a testing installation for liquid hydrogen. A leak developed on a valve installed on a purge line connected with a LH2 storage tank. This shut-off valve served to discharge hydrogen into the exhaust stack of the installation, in case LH2 evaporation from the filling or withdrawal hose was causing excessive pressure. It was also serving a purging purpose, by flushing the filling hose with gaseous hydrogen before filling the cylinder with LH2.
The valve was more than 20 years and was not sealing properly under cryogenic conditions, causing hydrogen gas to escape from the threated connection between the valve stem and the valve case. The valve failed on two internal parts: the metal diaphragm and the O-ring that served as a seal (a sealing with thoric geometry). The metal diaphragm no longer seated properly against the valve seat causing leakage.

Event Initiating system
Classification of the physical effects
Unignited Hydrogen Release
Nature of the consequences
Macro-region
Europe
Country
Germany
Date
Component involved
cryogenic valve
Failure mode
leak, no ignition
Initiating cause
material degradation (ageing)
Root causes
Unknown
Date entry in HIAD
14/12/2025

Facility

Application
Laboratory / R&D
Sub-application
LH2 storage
Hydrogen supply chain stage
All components affected

tank, piping

Process temperature range [C]
cryogenic temperature (below -50°C)
Process pressure range [MPa]
low to medium pressure (below 2 MPa)
Location type
Open
Location
industrial area
Operational condition

Emergency & Consequences

Number of fatalities
0
Number of injured persons
0
Post-event summary

A new valve and a new piping system ahd to be installed.

Emergency action

none required

Lesson Learnt

Corrective Measures

A new model from the same company had to be purchased, because the model of the defective valve was discontinued. The new valve was larger in outer dimensions than the old one. Therefore, the pipe routing around the valve had to be modified. A total of three new welds and an approximately 25 cm long, multiply bent new pipe section were required for installation. The tightness of the welds, the pipe, and the valve against the environment was successfully tested using a calibrated leak detector with a measuring range of from 0 to 1000 ppm H2.

In-depth data

Release type
gas
Involved substances (% vol)
H2 100%
Probable IGNITION SOURCE

References

Sources categories
Investigation report
Reference & weblink

Infrmation provided by project leader by email (6 October 2025) - CONFIDENTIAL