An explosion took place in the electrolysis room of a plant producing chlorine and its derivatives. An auxiliary outgoing circuit breaker opened, due to their ageing, to the overload of the auxiliary transformer and to high temperature. In absence of power, the mercury and brine pumps and the chlorine compressors stopped.
Under normal operating conditions, the circuit breakers of the three transformers supplying the current to the auxiliary systems of three electrolysers should all open (trip) automatically when the coil power supply is interrupted.In this case, however, one of the circuit breakers did not trip and remained closed, supplying 20 kA power to and one electrolysis room. The explosion occurred when the auxiliary transformer was finally closed after several attempts, 15 minutes later. The chlorine main collector upstream of the compressor was destroyed, 15 electrolytic cells were seriously damaged, but no casualty was reported.
- Event Initiating system
- Classification of the physical effects
- Hydrogen Release and Ignition
- Nature of the consequences
- Macro-region
- Europe
- Country
- France
- Date
- Component involved
- electrolytic cell
- Failure mode
- internal explosion
- Initiating cause
- malfunctioning (electrical/electronic component)
- Root CAUSE analysis
Since the malfunctioning circuit breaker was found in good condition and had been in operation for 2 years, the most probable explanation was the presence of a strong magnetic field generated by the nearby 50 kA conductors, which could have either excited the coil or induced a residual magnetisation of the breaker core.
A plausible cause for explosion was the formation hydrogen by the acidic attack at the bottom of the cells and production of sodium and potassium hypochlorite. The still running chlorine compressor extracted the hydrogen and reacted with the chlorine remaining in the pipe.
As the operator did not realise that the circuit breaker was not closed, he did not prohibit the reactivation of all auxiliary circuit breakers, as he should have done.
- Root causes
- Date entry in HIAD
- 28/02/2009
Facility
- Application
- Chemical industry
- Sub-application
- Chlorine production
- Hydrogen supply chain stage
- All components affected
electrolyser, circuit breaker
- Process temperature range [C]
- Above ambient temperature (50°C to 100°C)
- Location type
- Unknown
- Location
- industrial area
- Operational condition
- Pre-event occurrences
The circuit breaker which did not operate was in good state and only two years old.
Emergency & Consequences
- Number of fatalities
- 0
- Number of injured persons
- 0
- Post-event summary
The common chlorine collector and various compressors were destroyed. The electrolyser unit where the explosion took place was heavily damaged. No injuries among the personnel.
Lesson Learnt
- Corrective Measures
(1) Instructions were amended,
(2) Safety devices were installed to prevent magnetisation of the components of the circuit breakers,
(3) Provisions were made to reduce the power load of the circuit breaker of the auxiliary components.
In-depth data
- Release type
- Gas mixture
- Involved substances (% vol)
- H2,
CL2 - Release temperature [°C]
- 25
- Probable IGNITION SOURCE
- Explosion type
References
- Sources categories
- ARIA
- Reference & weblink
Event description in the French database ARIA
https://www.aria.developpement-durable.gouv.fr/accident/22101_en/?lang=…