An explosion took place in the electrolysis room of a plant producing chlorine and its derivatives. An auxiliary outgoing circuit breaker opened, due to their ageing, to the overload of the auxiliary transformer and to high temperature. In absence of power, the mercury and brine pumps and the chlorine compressors stopped.
Under normal operating conditions, the circuit breakers of the three transformers supplying the current to the auxiliary systems of three electrolysers should all open (trip) automatically when the coil power supply is interrupted.

In this case, however, one of the circuit breakers did not trip and remained closed, supplying 20 kA power to and one electrolysis room. The explosion occurred when the auxiliary transformer was finally closed after several attempts, 15 minutes later. The chlorine main collector upstream of the compressor was destroyed, 15 electrolytic cells were seriously damaged, but no casualty was reported.

Event Initiating system
Classification of the physical effects
Hydrogen Release and Ignition
Nature of the consequences
Macro-region
Europe
Country
France
Date
Component involved
electrolytic cell
Failure mode
internal explosion
Initiating cause
malfunctioning (electrical/electronic component)
Root CAUSE analysis

Since the malfunctioning circuit breaker was found in good condition and had been in operation for 2 years, the most probable explanation was the presence of a strong magnetic field generated by the nearby 50 kA conductors, which could have either excited the coil or induced a residual magnetisation of the breaker core.

A plausible cause for explosion was the formation hydrogen by the acidic attack at the bottom of the cells and production of sodium and potassium hypochlorite. The still running chlorine compressor extracted the hydrogen and reacted with the chlorine remaining in the pipe.

As the operator did not realise that the circuit breaker was not closed, he did not prohibit the reactivation of all auxiliary circuit breakers, as he should have done.

Root causes
Date entry in HIAD
28/02/2009

Facility

Application
Chemical industry
Sub-application
Chlorine production
Hydrogen supply chain stage
All components affected

electrolyser, circuit breaker

Process temperature range [C]
Above ambient temperature (50°C to 100°C)
Location type
Unknown
Location
industrial area
Operational condition
Pre-event occurrences

The circuit breaker which did not operate was in good state and only two years old.

Emergency & Consequences

Number of fatalities
0
Number of injured persons
0
Post-event summary

The common chlorine collector and various compressors were destroyed. The electrolyser unit where the explosion took place was heavily damaged. No injuries among the personnel.

Lesson Learnt

Corrective Measures

(1) Instructions were amended,
(2) Safety devices were installed to prevent magnetisation of the components of the circuit breakers,
(3) Provisions were made to reduce the power load of the circuit breaker of the auxiliary components.

In-depth data

Release type
Gas mixture
Involved substances (% vol)
H2,
CL2
Release temperature [°C]
25
Probable IGNITION SOURCE
Explosion type

References

Sources categories
ARIA
Reference & weblink

Event description in the French database ARIA
https://www.aria.developpement-durable.gouv.fr/accident/22101_en/?lang=…
(accessed October 2020)